Specification for Formwork Construction
1. General Requirements:
Ø Formwork
construction shall comply with relevant local building codes, regulations, and
standards.
Ø The
design and installation of formwork shall be carried out by qualified personnel
with experience in formwork construction.
2. Formwork Materials:
Ø Formwork
materials shall be suitable for the specific application and capable of
supporting the loads imposed by fresh concrete and construction activities.
Ø Formwork
materials may include timber, plywood, steel, aluminum, or other approved
materials.
Ø Formwork
materials shall be clean, free from defects, and adequately treated or
protected against moisture, decay, or damage.
3. Design and Planning:
Ø Formwork
design shall be based on the structural requirements and specified concrete
loads.
Ø The
design shall consider factors such as formwork type, dimensions, connections,
supports, and ties.
Ø Formwork
design drawings and calculations shall be prepared by a qualified engineer and
submitted for approval as required.
4. Formwork Construction:
Ø Formwork
shall be constructed according to the approved design and installation
instructions.
Ø Formwork
components shall be securely connected, aligned, and adequately braced to
withstand the loads and forces during concrete placement.
Ø Joints
and connections shall be tight to prevent leakage of concrete and maintain the
desired shape and dimensions.
Ø Formwork
shall be designed and constructed to facilitate easy removal after concrete
curing, without damaging the concrete surface.
5. Formwork Supports:
Ø Formwork
supports, such as props, shores, or scaffolding, shall be properly designed,
installed, and braced to provide adequate support and stability.
Ø The
spacing, size, and capacity of supports shall be determined based on the loads
imposed by the formwork and fresh concrete.
6. Formwork Ties and
Anchorage:
Ø Formwork
ties and anchors shall be designed and installed to resist the lateral pressure
exerted by fresh concrete.
Ø The
type, spacing, and capacity of ties shall be determined based on the formwork
height, concrete pressure, and other relevant factors.
Ø Tie
holes and anchorages shall be properly sealed or treated to prevent leakage of
grout or concrete.
7. Inspection and Quality
Control:
Ø Formwork
shall be inspected before concrete placement to ensure its integrity, stability,
and compliance with the approved design.
Ø Regular
quality control checks shall be conducted, including dimensional checks,
verification of formwork alignment, and inspection of connections and supports.
Ø Any
defects, damage, or deficiencies in formwork shall be addressed promptly and
rectified before concrete placement.
1.
Safety:
Ø Adequate
safety measures shall be implemented during formwork construction to ensure the
well-being of workers and comply with safety regulations.
Ø Proper
scaffolding, fall protection, and personal protective equipment (PPE) shall be
provided and utilized.
Ø Formwork
shall be constructed and maintained in a manner that minimizes the risk of
collapse or accidents during concrete placement.
2.
Documentation:
Ø Detailed
documentation, including formwork design drawings, calculations, inspection
reports, and records of any modifications or changes, shall be maintained for
record purposes.
Note:
This specification serves as a general guideline. It is essential to consult
the specific project requirements, design drawings, and local building codes to
create a comprehensive and accurate formwork specification.