1. General Requirements:
Ø Pointing
work shall comply with relevant local building codes, regulations, and
standards. b. The design and execution of pointing work shall be carried out by
a qualified masonry contractor or professional.
2. Materials:
Ø Mortar
Mix: Use a suitable mortar mix, which may include cement, lime, sand, and
additives, as specified in the design or architectural drawings.
Ø Pointing
Tools: Utilize appropriate pointing tools, such as trowels, jointers, or
pointing guns, for the application of mortar.
3. Surface Preparation:
Ø Cleaning:
Ensure that the joint surfaces are clean, free from dust, debris, loose mortar,
and any contaminants that may affect the adhesion and durability of the
pointing mortar.
Ø Dampening:
Dampen the joint surfaces with water before applying the pointing mortar to
prevent excessive absorption of moisture from the fresh mortar.
4. Pointing Techniques:
Ø Flush
Pointing: Apply the pointing mortar to fill the joints completely, making the
surface of the mortar flush with the face of the masonry units.
Ø Recessed
Pointing: Apply the pointing mortar slightly recessed from the face of the
masonry units to create a neat and visually appealing finish.
Ø c.
Weathered Pointing: Create a sloped or beveled profile on the pointing mortar
to deflect water away from the joint and enhance weather resistance.
5. Joint Dimensions:
Ø Joint
Width: Maintain the joint width as per the design or architectural
requirements, ensuring uniformity throughout the pointing work.
Ø Joint
Depth: Ensure that the pointing mortar adequately fills the joint depth,
providing sufficient strength and support to the masonry.
6. Mortar Application:
Ø Mortar
Consistency: Prepare the pointing mortar to the specified consistency, which
should allow for easy application and proper adhesion to the joint surfaces.
Ø Mortar
Bonding: Ensure a strong bond between the pointing mortar and the masonry units
by pressing the mortar firmly into the joints and ensuring full contact.
7. Finish and Appearance:
Ø Tooling:
Use appropriate tools to shape and finish the pointing mortar, such as striking
or jointing tools, to achieve the desired appearance and texture.
Ø Color
Matching: Match the color of the pointing mortar to the existing mortar or as
specified in the design, using suitable pigments or additives if necessary.
8. Protection and Curing:
Ø Protection:
Protect the newly pointed joints from excessive moisture, direct sunlight,
rain, or other factors that may impair proper curing and drying.
Ø Curing
Time: Allow adequate time for the pointing mortar to cure and set according to
the manufacturer's recommendations and environmental conditions.
9. Quality Control and
Inspection:
Ø Regular
quality control checks, such as visual inspections, adhesion tests, and color
matching, shall be conducted to ensure compliance with the specified standards
and appearance.
Ø Any
identified defects or imperfections should be rectified promptly before final
acceptance.
10. Safety:
Ø Adequate
safety measures shall be implemented during pointing work to ensure the
well-being of workers and comply with safety regulations.
Ø Proper
ventilation, use of personal protective equipment (PPE), and adherence to safe
work practices shall be ensured.
11. Documentation:
Ø Detailed
documentation, including pointing drawings, material specifications, test
reports, and compliance certificates, shall be maintained for record purposes.
Note:
This specification serves as a general guideline. It is essential to consult
the specific project requirements, design drawings, and local building codes to
create a comprehensive and accurate pointing work specification.